×
  • English
  • Swedish
  • German
  • French

Concrete roads

The roads of the future are concrete

Concrete roads

Concrete roads

Concrete roads can be ground down advantageously to reduce noise and particles. A newly cast concrete surface becomes harder after grinding once the soft top layer has been removed and the ballast is more exposed. Our technology can be used both in heavy concrete tunnels and on other surfaces such as concrete roads. There are many advantages to grinding, and our larger equipment has a high capacity. It presents plenty of advantages, but reduced noise, more even surfaces and greater friction are some of them, as well as its high cost-effectiveness as a way of working a surface.

Many advantages of ground concrete roads

  • Reduced noise
  • Reduced particle emission
  • Increased friction
  • Lighter roadways
  • Extended service life
  • Increased driving comfort
  • Lower rolling resistance
  • Reduced fuel consumption

Experience shows that the grinding of newly built concrete roads should be planned in before they are opened to traffic. Since our large grinding machines remove material at a high rate, closure times for regrinding are short.

Subscribe to newsletter
Find HTC Dealer

HTC have distributors in most part of the world. Find your local distributor or contact HTC if no distributor is available in your country.

HTC Academy

The HTC Academy has since 2004 educated thousands of satisfied professionals worldwide. Book your seat now.

Business with HTC

HTC can offer your business the latest technology and the best prospects for your business to grow. Learn more about HTC Group and what the benefits are when working with the market leader.

HTC Professional Floor Systems