Save time

Revolutionize the construction process

  • A constructions site
    A constructions site
  • A constructions site
    A constructions site
  • A constructions site
    A constructions site

HTC vs traditional construction process

Save up to 5 weeks in drying time for concrete slabs, with no self-levelling compound required. After as little as 2 days of hardening the concrete, it is possible to grind the slab and then move on with construction immediately.

In the traditional construction process the concrete slab needs 28 days of hardening before you can prime and apply self-levelling compound. Once applied the slab needs a further 7-14 days drying period. That's a total of 35 to 42 days before other building work can commence.

With an estimated grinding time of 3-5 days you will have gained around 35 days using the HTC method instead.

Read more about the HTC method compared with the traditional construction process.

Subscribe to newsletter
Find HTC Dealer

HTC have distributors in most part of the world. Find your local distributor or contact HTC if no distributor is available in your country.

HTC Academy

The HTC Academy has since 2004 educated thousands of satisfied professionals worldwide. Book your seat now.

Business with HTC

HTC can offer your business the latest technology and the best prospects for your business to grow. Learn more about HTC Group and what the benefits are when working with the market leader.

HTC Professional Floor Systems